≤4h
Response Time
≥100%
On-time dispatch rate

Biomass-to-Power Alternative: Biomass Gasification Power Plant Industrial Power Generator Renewable Energy Solution

No reviews yet
$44,076
Minimum order quantity: 1 set

model number

200kw

Key attributes

Voltage

220 V

Power(W)

200kw

core components

furnace

warranty

1 Year

machinery test report

Provided

video outgoing-inspection

Provided

Shipping

Shipping fee and delivery date to be negotiated. Chat with supplier now for more details.

Alibaba.com order protection

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Money-back protection

Claim a refund if your order doesn't ship, is missing, or arrives with product issues

1-year warranty

Access to free parts replacement and repair coverage

Finance Service

4 interest-free payments with

Service

Free replacement parts & online technical support
Free replacement parts & online technical support
1-year warranty
1-year warranty

Key attributes

Voltage
220 V
Power(W)
200kw
core components
furnace
warranty
1 Year
machinery test report
Provided
video outgoing-inspection
Provided
place of origin
Henan, China
Weight (kg)
4000
brand name
hejia
Furnace inner diameter(mm)
1300
Furnace cross-sectional area(m2)
1.326
Biomass consumption(kg/h)
≤180
Gas production(m3/h)
≤650
Raw material
agricultural biomass materials,municipal solid waste,biomass feedstock
Gas calorific value(KJ/m3)
4600-5000
Air consumption (m3/kg)
2.2-2.8
Steam consumption (m3/kg)
0.3~0.5
Gas outlet temperature(℃)
400~550
Saturated air temperature(℃)
50~65

Packaging and delivery

Selling Units
Single item
Single volume
0 cm³
Single gross weight
0.0 kg

Lead time